To install New Pipe 2 Trip Job
4

Air Conditioner Installation at HDB Hougang
6

bukit batok st 22
4

Check and Replace Water Pump Set
4

check vrv Daikin In Bukit Timah
8

Check VRV System and Replace Compressor at Sentosa
9

Checking Aircon At Bukit Timah
2

chemical Comppessor Unit At Ghim Moh Rd
5

Chemical Overhaul At Bukit Batok
8

Chemical Overhaul at HDB Woodlands
4

chemical overhoul at jurung west
3

Chemical Overhoul In Condominium Bukit Batok
3

Chemical Wash Compressor Unit at Tuas Area
4

Chemical Wash Duct Unit at Condominium CBD
4

Complete the installation of System 1 at 23 Balmoral Park
3

Complete the installation of System 2 at Serangoon ave 3
6

Complete the installation of System 2 at Tampines Street
3

FOC Site Survey Jurung
4

Install New Airconditioning At Bukit Batok
9

Install New VRV System At Condominiums
3

Install System 2 Aircond at Private House
4

Installation At Yishun
5

Installation Ceiling Unit in Tuas Area
3

Installation Mini VRV in Tuas Area
4

Installation VRV at Kim Teck rd Industry Area
2

Normal service at blk 325 clementi
2

normal service at bukit timah
6

Normal Servicing At Bukit Timah
2

Re Vacuum System
3

Replace Indoor Control Board in Ang Mo Kio
3

Replace Outdoor Condenser Unit and Testing Commissioning
3

Replace PCB Board and Fan Motor at HDB Bukit Batok
4

Replace water pump set done at Ang mo Kio tested normal
6

Service Fancoil Unit
5

Servicing At Bukit Batok
2

To Chemical Wash Outdoor Unit CU
5

To Contact Service At Bukit Timah Area
5

To Dismantled Water Trey To Replace Water Pump Set
4

To Replace Fanmotor Set
4

To Replace VRV Filter Dryer